Factory Capabilities
Verifiable Clean Manufacturing Power
15,295㎡
Factory floor area
57Platform
Injection molding and supporting equipment
7,648ten thousand
annual production capacity
478one
Serve Customers
FACTORY
Production Workshop Gallery
The workshop scene image is an AI-generated illustration; the actual enterprise photo will prevail.

Cleanroom Injection Molding Workshop
Clean, bright production facility with rows of machines arranged in depth.
WAREHOUSE
Warehousing & Shipping
Standardize warehousing and inventory management to support bulk orders and consistent, reliable supply.

Standardized Warehouse
Standardized racking array, finished goods zone management, and protective packaging to ensure shipment quality (warehouse data to be provided).

Pack & Ship
Multi-layer protective packaging, clean dust-free boxing, with support for domestic logistics and export container shipping.
CERTIFICATIONS
Certification
Some certificates are scanned copies held by the enterprise; other entries are based on documents actually held by the enterprise and will be updated upon submission.

Quality Management System Certification
The company has obtained a quality management system certification.

Food Contact Material Testing
Test report is subject to the enterprise's actual possession.

Environmental Management System Certification
The company has obtained the Environmental Management System certification.

Occupational Health and Safety Management System Certification
The company has obtained certification for its Occupational Health and Safety Management System.

Export packaging testing
Information is subject to the enterprise's actual holdings.

Utility Model Patent
Patent list is subject to the enterprise's actual holdings.

QS Food Production License
The company has obtained the food production license certificate.

Enterprise Credit Qualifications
Qualifications are subject to the enterprise's actual holdings.
QUALITY CONTROL
Quality Control
Standardize process parameters, archive inspection data by batch, and enable full-process traceability.

Mold and Injection Parameter Monitoring
Standardize mold temperature control and injection molding parameters to ensure uniform wall thickness and stable barrel structure.

Finished Dimensions & Seal Inspection
Comprehensive inspection of dimensions, sealing performance, and appearance. Inspection data is archived by batch for full traceability.

First article inspection (printing)
Mass production may only commence after color and registration alignment are confirmed for the first article in screen printing, in-mold labeling, or heat transfer processes.
PROCESS
Process Flow
Raw Material Inspection
Food-grade PP/HDPE raw material: Inbound inspection and batch sample retention
Injection Molding
Standardize mold temperature control and injection parameters to ensure uniform wall thickness.
Quality Inspection
Deburring, Dimensional Measurement, and Full Visual Inspection
Custom Printing
Screen printing, In-mold labeling, or Heat transfer: Mass production after first article approval.
Package inbound
Layered palletizing, dust-proof packaging, and pre-shipment quality inspection
